Funding logic
Funding bodies look for credible baselines, measurable CO2 reductions, project maturity and implementation capacity.
Engineering package
A robust package includes energy baseline, heat balance, concept design, CapEx/OPEX model, CO2 model, risks and timeline.
Engineering FAQs
When should subsidies be assessed?
Early enough to shape scope, but after the technical opportunity is real.